CESSY STUDIOUne autre façon de déployer vos flux documentaires.Découvrir la plateforme
MISSION CONTROL

Déployez une nouvelle version sans remplacer la production à l’aveugle.

Gardez la baseline stable, routez une part contrôlée vers le candidate et n’augmentez l’exposition qu’avec de vraies preuves.

Mission Control canary rollout illustration
Simulation
Start canary
Collect evidence
Increase traffic
Promote or rollback
SAFE RELEASE GUIDE

Traffic is routing, not a test counter.

At 5%, eligible production requests remain mostly on the stable baseline while a small share is routed to the candidate. Increasing traffic changes that future routing share; it does not generate documents by itself.

01

Production baseline · v3

Baseline and candidate stay explicit

02

Staging candidate · v4

Traffic increases only with evidence

03

Promote / Rollback

Rollback remains a first-class action

Cessy document workflow from authoring to production
EVIDENCE GUARDRAILS

No blind traffic increases.

The rollout can require minimum candidate samples and healthy runtime metrics before the next exposure step becomes available.

template_version=v4 · environment=production · rollout=canary_42 · status=success · render_ms=1184
AUDIT + TRAÇABILITÉ

Telemetry should answer which version rendered a document, under which rollout, how long it took and whether it succeeded.

A staged version only receives production samples when eligible document requests are routed to it.

TWO SAFETY PATHS
Increasing traffic does not generate documents; production usage creates the evidence used for rollout decisions.

Keep traffic at 5% until the minimum healthy sample threshold is reached.